Design and detailed documentation development for the boiler house with the power of 12 MW
Customer: Construction Department of the Moscow region, RF
Location: Novorossiysk, the Krasnodar Territory
Company sector:
Hydraulic engineering construction, industrial and civil construction, industrial production, design
Date of works held:
August 2016 - September 2016
Project:
Design and detailed documentation development
for the boiler house with the power of 12 MW
The key feature of the work performed was the design of the facility for the Ministry of Defense of the Russian Federation in compliance with additional requirements (fortification and blackout).
Design and detailed documentation was developed under the project.
Main specifications:
1. Fuel - gas, diesel fuel;
2. Thermal power - 13 MW;
3. Fuel storage capacity - 200 m3;
4. Pressure in the gas supply system - over 1,2 MPa.
Specific features and complexities of the project
- port infrastructure facility;
- the Ministry of Defence of the Russian Federation facility;
- particular requirements - fortification, blackout.
Do you want to get a calculation of designed cost?
In order to find out the cost of the project, SARRZ makes engineering design based on the running conditions and Customer requirements. Information about the project and requirements:
- may be discussed at +7(8452)250-288
- may be sent by e-mail zakaz@sarrz.com in a form of a completed Data sheet or technical requirements (capacity, performance requirements, operating medium and its characteristics, operating conditions, general description of the production line)
The Saratov Reservoir Plant performs multiple services for the oil and gas facilities construction. We offer:
- engineering surveys at oil and gas facilities, including highly dangerous and technically challenging objects
- the design, project development and authority engineering approval of the oil and gas and chemical facilities construction
- vertical tanks, vessels, apparatus and other metal structures fabrication
- manufactured products delivery and installation in accordance with the tie-in design