Vertical tank VST-5000 for oil products storage

Customer: Oil refinery

Location: Ukhta, the Komi Republic

Company sector:
A large enterprise for oil refinement

Date of works held:
July 2017 - February 2018

Project:
Oil-storage tank

The Customer`s priority when choosing the contractor was the choice of a reliable company that has completed projects that meet quality standards. Due to the high performance level, the SARRZ Plant was able to establish partnership relations with the Customer and implement the project in accordance with the approved work specification.

A Process Design Package was developed for the Customer: KJ project - RC construction project, KM project - structural steel project, TI project - thermal insulation project, AKZ project - corrosion protection system design. The production of the tank structural steel was carried out in the factory by the rolling method from steel grade 09G2S. The erecting works included the unrolling of the tank shell plates, welding of the butt joints, laying of the roof steel structures, asembly of stairs and service platforms, and a pontoon.

Main specifications:

  1. Stored product - oil products;
  2. Material - 09G2S;
  3. Erection procedure - Roll method;
  4. Capacity - 5000 m3.
Vertical steel tank for oil products storage

Specific features and complexities of the project

Vertical steel tank 5000 m3 in Ukhta

The oil products tanks erection was carried out in the conditions of the operating enterprise, as well as the old tank and the tank base dismounting was performed, followed by a new piled rafts arrangement (200 m3, 137 piles with a length of 9 m).

Vertical steel tank VST-5000 was manufactured with an aluminum pontoon to prevent evaporation of products and is equipped with an Endress House control and instrumentation system, fire extinguishing and deluge system, lightning protective and grounding system.

 

The Saratov Reservoir Plant carried out the tank construction service including the old tank and the tank base dismantling and a new vertical tank VST-5000 erection. The list of works was determined by the work specification of the customer and comprised:

  • engineering design for RC construction, structural steel, thermal insulation and corrosion protection system;
  • vertical steel tank manufacture from 09G2S steel grade;
  • delivery of the steel rolled plates by road;
  • an old tank dismantling;
  • construction and installation activities of VST-5000 with non-destructive examination;
  • hydraulic tests and anti-corrosive coating application on the outer and inner surfaces of the tank.

Сompleted work

Engineering design for RC construction, structural steel, thermal insulation and corrosion protection system
Vertical steel structures of VST 5000 m3 and accessory equipment manufacture
Construction and installation activities of VST-5000 with non-destructive examination
Anti-corrosive coating application on the outer and inner surfaces of the tank
 

Customer feedback

Development Deputy chief engineer Sandalov A.M.

We express our gratitude to You and the design department of the Saratov Reservoir Plant for the development of Detailed Engineering Design: "Reject of Te'buksk oil for processing by OOO "LUKOIL-UNP" Shop No. 3 "Feed and product".

Under the scope of the project, a complex of design and survey work package was carried out on a VST-5000 m3 with a pontoon for receiving, storing and pumping of product oil, including support infrastructure. Engineering surveys (geodesic, geological) were carried out in the conditions of an operating enterprise, a full set of Detailed Engineering Design was developed for the VSTp 5000 m3 tank (with a pontoon) with the appropriate process piping for receiving, storing and pumping ofproduct oil.

When performing the work, OOO "SARRZ" has shown itself as a reliable partner, promptly responding to the wishes of the Customer while maintaining the proper quality of the result of the work.

We recommend OOO "SARRZ" as a reliable project designer who performs design and survey work of oil products storage facilities.

 

Do you want to get a calculation of designed cost?

In order to find out the cost of the project, SARRZ makes engineering design based on the running conditions and Customer requirements. Information about the project and requirements:

  • may be discussed at +7(8452)250-288
  • may be sent by e-mail zakaz@sarrz.com in a form of a completed Data sheet or technical requirements (capacity, performance requirements, operating medium and its characteristics, operating conditions, general description of the production line)

The Saratov Reservoir Plant performs multiple services for the oil and gas facilities construction. We offer:

  • engineering surveys at oil and gas facilities, including highly dangerous and technically challenging objects
  • the design, project development and authority engineering approval of the oil and gas and chemical facilities construction
  • vertical tanks, vessels, apparatus and other metal structures fabrication
  • manufactured products delivery and installation in accordance with the tie-in design