Print version

Construction of diesel fuel tank farm in Yakutia

Customer:
АО "Zvezda"

Location:
Republic of the Sakha, Yakutia

Company sector:
An international diversified holding mineral extraction company. 

Date of works held:
February 2019 - December 2019

Project:
Construction of tank farm for diesel fuel and water storage in Yakutia

The main feature of the last project is the construction in adverse climatic conditions: with a long cold winter and a short hot summer. Due to the quality high level of the work performed, the SARRZ Plant was able to establish partnership relations with the Customer and deliver the project in accordance with the approved technical specifications for execution of works.

Main specifications:

  1. Stored product - diesel fuel and water;
  2. VST amount - 1 pcs with a capacity of 2000 m3, 2 pcs with a capacity of 1000 m3 each;
  3. Material - 09G2S;
  4. Erection procedure - Roll method.
Tank farm construction in Yakutia

Specific features and complexities of the project

Construction and assembly work in Yakutia

The key feature of the end project was the environmental conditions with a long cold winter and a short hot summer. Site Supervision was carried out in the winter season, which is characterized by low ambient temperature and a pronounced markedly continental climate.

Due to the high significance of the facility, it was necessary to execute all the  construction work in a short time: design, manufacture, delivery, erection supervision work, hydraulic testing and non-destructive testing of structures and anti-corrosion protection took 10 months.

The work was carried out at a considerable distance from the human settlements.

 

The Engineering department of the Saratov Reservoir Plant carried out work in the supply of VST, namely:

  • development of Detailed Engineering Design (KM project);
  • manufacture of vertical steel tank;
  • delivery by road;
  • construction and assembly work and Site Supervision;
  • hydraulic testing and NDT inspection;
  • anticorrosive coating application on external and internal surfaces of tanks (AntikorKhim - 3 layers).

Сompleted work

KM project and heat insulator project development for the tank farm
Manufacture of the three vertical tanks for diesel fuel and water storage
Erection supervision work during the construction of tank farm in Yakutia
Staff briefing on the operation and maintenance of the tanks for diesel fuel
 

Do you want to get a calculation of designed cost?

In order to find out the cost of the project, SARRZ makes engineering design based on the running conditions and Customer requirements. Information about the project and requirements:

  • may be discussed at +7(8452)250-288
  • may be sent by e-mail zakaz@sarrz.com in a form of a completed Data sheet or technical requirements (capacity, performance requirements, operating medium and its characteristics, operating conditions, general description of the production line)

The Saratov Reservoir Plant performs multiple services for the oil and gas facilities construction. We offer:

  • engineering surveys at oil and gas facilities, including highly dangerous and technically challenging objects
  • the design, project development and authority engineering approval of the oil and gas and chemical facilities construction
  • vertical tanks, vessels, apparatus and other metal structures fabrication
  • manufactured products delivery and installation in accordance with the tie-in design