Settling tanks with baffle plate OGN P
Description
Settling tanks OGN-P are used for oilfield water and gas escape from crude-oil emulsion due to baffle plates placed inside the body. They also purify oil from mechanical impurities and suspended particles.
The Saratov Reservoir Plant produces oil settling tanks with baffle plates with a volume from 25 m3 to 200 m3 made of steel grades 09G2S and 16GS, depending on the operating conditions and Customer requirements.
Settling tanks design and operating peculiarities
Settling tanks of this type have a horizontal cylindrical body with elliptical heads. The walls and heads contain a manhole, a stripping manhole and fittings for oil emulsion inlet, dewatered and refined oil, oilfield water and gas outlet, drainage, installation of process equipment (pressure gauge, interface level gauge, shut-off and safety valves, thermometer, interface level controller, etc.). The equipment configuration is selected on basis of the the operating procedure characteristics at the facility.
The installation is ground-based on saddle supports or platforms. The housing can be heat-insulated, which allows to operate the settling tanks at sub-zero temperatures.
There are two compartments inside the OGN-P type settling tank: the first has baffles and is intended for settling, the second accumulates oil already cleared of oilfield water, gas and impurities.
First, the oil emulsion enters the lower part of the shell, then separates from components due to the gravitational force. Then the oil rises and enters the storage compartment through the baffles. The separated water moves along the lower part of the shell to the water relief fitting. The task of intermediate baffles is that they separate oil from water droplets and particulate matters (in the upper part) and oil droplets (in the lower part).
Separated water and oil move from the lower and upper parts of the shell and enter the space between the intermediate baffles. The contained mechanical impurities settle to the bottom and then are removed.
As the tank is filled, the already refined oil goes from the space above the baffles to the oil compartment, and then removed from the tank.
Settling tank with baffle plate OGN P drawing
Nozzle schedule
Designation | Assignment |
---|---|
А1 | initial product inlet |
Б1 | oil outlet |
В1 | water outlet |
Г | gas outlet |
Д1, Д2 | drainage |
Е1, Е2 | manhole |
Ж1 | pressure gauge |
И1 | gasket |
К1 | safety valve |
Л1 | temperature probe |
М1 | interface level controller |
Н1 | level control |
П1, П2 | level gauge cabinet |
Р1 | stripping manhole |
С1 | gas-equalizing line |
Typical overall dimensions
Capacity, m3 | 25 | 50 | 100 | 200 | |
---|---|---|---|---|---|
Liquid treatment capacity, m3/day | 2000 | 4000 | 7500 | 15000 | |
Nominal pressure, MPa (kp/cm2) |
1.0(10) 1.6(16) 2.5(25) |
1.0(10) 1.6(16) 2.5(25) |
1.0(10) 1.6(16) 2.5(25) |
1.0(10) 1.6(16) |
|
Inside diameter | 2400 | 2400 | 3000 | 3400 | |
Material design 1,2,3 |
Sk |
10 14 18 |
10 14 18 |
12 16 22 |
12 16 |
Sq |
10 14 18 |
10 14 18 |
14 16 22 |
16 16 |
|
S |
6 6 10 |
6 6 10 |
8 12 18 |
8 10 |
|
L |
6285 6290 6340 |
11485 11490 11540 |
14385 14395 14485 |
22090 | |
l | 4500 | 9700 | 12300 | 19800 | |
l1 | 600 | 1200 | 1500 | 2500 | |
l2 | 2700 | 6700 | 8000 | 13000 | |
l3 | 850 | 1500 | 2150 | 3400 | |
l4 | 350 | 500 | 700 | 1000 | |
l5 | 1750 | 2750 | 2750 | 2750 | |
l6 | 600 | 1250 | 1500 | 2500 | |
l7 | 1200 | 2500 | 3000 | 5000 | |
l8 | 300 | 400 | 500 | 500 | |
l9 | 500 | 800 | 1000 | 1000 | |
l10 | 300 | 600 | 900 | 900 | |
l11 | 1125 | 2425 | 3075 | 4950 | |
l12 | 1125 | 2425 | 3075 | 4950 | |
l13 | 1125 | 2425 | 3075 | 4950 | |
l14 | 1125 | 2425 | 3075 | 4950 | |
l115 | 475 | 1125 | 1125 | 1750 | |
l116 | 600 | 2000 | 2000 | 2000 | |
l17 | 400 | 800 | 1000 | 1000 |
Settling tanks with baffles performance capability
Criteria | Value |
---|---|
Operating medium | oilfield emulsion with water, gas and mechanical impurities |
Capacity, m3 | 25-200 |
Material | 09G2S, 16GS |
Operating pressure, MPa | 1.0; 1.6; 2.5 |
Producing capacity, m3/day | 2000-15000 |
Operating medium temperature, ºС | -60...+100 |
Ambient temperature, ºС | -40...+60 |
Climatic category | N, NF |
Seismicity, points | up to 8 (more than 8 at special order) |
How to buy settling tank with baffles at SARRZ?
To get to know the price and to order settling tank OGN-P type, You may:
- call at +7(8452)250-288
- email at
- use request form "Request for quotation": fill in contact information, and we will call You back
SARRZⓇ supplies of the entire range of equipment for oilfield enterprises: oil and gas separators and settling tanks, oil, gas and water treatment plants, etc. We also perform installation and commissioning of manufactured equipment. For complex delivery, we offer individual terms of cooperation.
See also: